This page provides a dynamic look at Mike’s port and harbor resume, based on his experience at Northern Economics, Inc. In the table view, you can search, filter, and sort (by clicking on a column heading). Click on a project to see a short description and to access the full project page. In the map view, zoom in on the dots to view project experience by location.
| Year | Client | Project Name | Type | Location | Region |
|---|---|---|---|---|---|
| 2025 | Municipality of Skagway Borough | Skagway Port and Harbor Rate Study | Rate Study | Skagway, AK | Alaska |
|
Rate studies for the small boat harbor (life-cycle cost approach) and port facilities, with tariff comparison across regional ports. — View project page
|
|||||
| 2025 | Port of Corpus Christi Authority | Tariff Rate Adjustments Study | Rate Study | Corpus Christi, TX | Texas |
|
Study of tariff update practices at comparison ports, examining metrics, frequency, and commodity-level vs. across-the-board adjustment approaches. — View project page
|
|||||
| 2025 | City of Whittier / Corvus Design | Whittier Development Plan | Economic StudyPlanning | Whittier, AK | Alaska |
|
Socioeconomic and financial profile of Whittier’s waterfront to support the Waterfront Development Plan. — View project page
|
|||||
| 2025 | City of Kotzebue / DOWL | Cape Blossom Port Economic Study | Economic Study | Kotzebue / Cape Blossom, AK | Alaska |
|
Assess whether a port at Cape Blossom could offer lower costs to Northwest Arctic Borough residents. — View project page
|
|||||
| 2024 | Matanuska-Susitna Borough / Axiom Environmental | Benefits of the Port MacKenzie Barge Ramp | Benefit-Cost Analysis | Port MacKenzie, AK | Alaska |
|
Benefits analysis for Port MacKenzie barge ramp PIDP grant application, greatly expanding on prior year’s identified and quantified benefits. — View project page
|
|||||
| 2024 | City of Cordova | Benefit-Cost Analysis for Cordova North Harbor Efficiency and Resiliency Project (2024) | Benefit-Cost Analysis | Cordova, AK | Alaska |
|
Minor update to the Cordova North Harbor benefit-cost analysis for a 2024 PIDP grant for north waterfront and harbor improvements. — View project page
|
|||||
| 2024 | City of Nome / PND Engineers | Port of Nome Strategic Development Plan Update | Planning | Nome, AK | Alaska |
|
Community and industry profile to support the Port of Nome Strategic Development Plan update, focused on deepwater access development. — View project page
|
|||||
| 2024 | City of Nome | Port of Nome Tariff Rate Study & Analysis | Rate Study | Nome, AK | Alaska |
|
Tariff study for the Port of Nome with three traffic and revenue scenarios over a ten-year horizon. — View project page
|
|||||
| 2024 | City of Ketchikan | Ketchikan Port Rate Study | Rate Study | Ketchikan, AK | Alaska |
|
Market comparison study of cruise ship port rates across Alaska and comparable North American ports, including gateway cost-per-call analysis. — View project page
|
|||||
| 2024 | Port of Corpus Christi Authority | Port of Corpus Christi Tariff Review | Rate Study | Corpus Christi, TX | Texas |
|
Comprehensive tariff review and gateway cost analysis comparing rates item-by-item across multiple reference ports. — View project page
|
|||||
| 2023 | City of Cordova | Benefit-Cost Analysis for Cordova North Harbor Efficiency and Resiliency Project (2023) | Benefit-Cost Analysis | Cordova, AK | Alaska |
|
Major rewrite of the Cordova North Harbor benefit-cost analysis for a 2023 PIDP grant application with a narrowed scope of improvements. — View project page
|
|||||
| 2023 | American Samoa Dept. of Port Administration / Lynker | American Samoa Department of Port Administration PROTECT Grant | Benefit-Cost Analysis | American Samoa | Pacific |
|
Benefit-cost analysis for a PROTECT Grant application for shoreline protection of the Pago Pago International Airport runway and lagoon. — View project page
|
|||||
| 2023 | City of Ketchikan | Ketchikan Harbor Revenue Projections | Rate Study | Ketchikan, AK | Alaska |
|
Revenue projections for Ketchikan’s boat harbors based on a staff-developed rate increase plan, used to support a presentation to the Port & Harbors Advisory Board. — View project page
|
|||||
| 2023 | City of Ketchikan | Ketchikan Moorage Rate Study | Rate Study | Ketchikan, AK | Alaska |
|
Rate study for all of the harbors in Ketchikan’s harbor system, using a life-cycle cost approach. — View project page
|
|||||
| 2023 | Matanuska-Susitna Borough / R&M Consultants | Benefits of the Port MacKenzie Barge Ramp and Cargo Handling Infrastructure Project | Benefit-Cost Analysis | Port MacKenzie, AK | Alaska |
|
Benefits study for Port MacKenzie improvements including a barge ramp, storage building, fuel tanks, and dock equipment for a PIDP grant application. — View project page
|
|||||
| 2023 | BOEM / SWCA Environmental | Revolution Wind Farm EIS | RegulatoryRisk Assessment | Rhode Island (offshore) | Atlantic |
|
Led vessel traffic and navigational risk analysis for the Environmental Impact Statement for the Revolution Wind Farm offshore project. — View project page
|
|||||
| 2022 | City of Cordova | Cordova Harbor Rate and Cash Flow Study | Rate Study | Cordova, AK | Alaska |
|
Harbor system rate study with three fifty-year cash flow scenarios incorporating debt service and grant funding for planned major replacements and improvements. — View project page
|
|||||
| 2022 | City of Cordova | Cordova Harbor Rebuild (Phase 2) Benefit-Cost Analysis for PIDP Grant | Benefit-Cost Analysis | Cordova, AK | Alaska |
|
Major rewrite of the Cordova North Harbor benefit-cost analysis for a 2022 PIDP grant, with expanded scope covering bulkheads, fuel dock, dock repairs, and shore power. — View project page
|
|||||
| 2022 | City of Homer | Homer Harbor Benefits White Paper | Economic Study | Homer, AK | Alaska |
| 2022 | City of Kodiak | 2022 PIDP Grant Application BCA for the Saint Herman Harbor Berth Improvement Project | Benefit-Cost Analysis | Kodiak, AK | Alaska |
|
Benefit-cost analysis for a PIDP grant for the Saint Herman Harbor berth improvement project, with safety as the primary monetized benefit. — View project page
|
|||||
| 2022 | City of Kodiak / RESPEC | Kodiak Waterfront Master Plan Update | Rate Study | Kodiak, AK | Alaska |
|
Harbor system rate study to identify revenue needs as part of the Kodiak Waterfront Master Plan update, incorporating facility replacement timing and capital costs. — View project page
|
|||||
| 2022 | City of Saint Paul / R&M Consultants | St. Paul Harbor BCA | Benefit-Cost Analysis | St. Paul Island, AK | Alaska |
|
Updated and expanded benefit-cost analysis for a 2022 PIDP grant for St. Paul harbor improvements. — View project page
|
|||||
| 2022 | Port of Corpus Christi Authority | Pilot Tariff Study | Rate Study | Corpus Christi, TX | Texas |
|
Competitive tariff study comparing Aransas-Corpus Christi Pilots’ rates against other Gulf Coast pilot service providers. — View project page
|
|||||
| 2021 | City of Cordova | Cordova South Harbor Benefit-Cost Analyses for RAISE and PIDP Grants | Benefit-Cost Analysis | Cordova, AK | Alaska |
|
Benefit-cost analysis for RAISE and PIDP grant applications for South and North Harbor improvements, including expanded benefits quantification and sensitivity analyses. City of Cordova was awarded a $20M RAISE grant for its South Harbor. — View project page
|
|||||
| 2021 | City of False Pass | False Pass Harbor House BCA | Benefit-Cost Analysis | False Pass, AK | Alaska |
|
Benefit-cost analysis and supporting documentation for a new harbor house, tailored to meet the requirements of three separate granting agencies. — View project page
|
|||||
| 2021 | Haines Borough | Lutak Dock BCA and Job Creation Analysis | Benefit-Cost Analysis | Haines, AK | Alaska |
|
Benefit-cost analyses for RAISE and PIDP grant applications for the Lutak Dock, plus a job creation analysis for a future EDA application. Haines Borough was awarded a $20M RAISE grant. — View project page
|
|||||
| 2021 | City of Saint Paul / R&M Consultants | St. Paul Harbor BCA for PIDP Grant | Benefit-Cost Analysis | St. Paul Island, AK | Alaska |
|
Benefit-cost analysis for a PIDP grant application for harbor improvements, with increased safety as the primary quantified benefit. — View project page
|
|||||
| 2021 | City of Saint Paul / R&M Consultants | St. Paul Harbor Feasibility Study | Feasibility Study | St. Paul Island, AK | Alaska |
|
Financial feasibility assessment for port and harbor facility improvements in Saint Paul, including life-cycle cost estimates for new moorage and dock facilities. — View project page
|
|||||
| 2021 | BOEM / SWCA Environmental | South Fork Wind Farm Project EIS | RegulatoryRisk Assessment | Long Island, NY (offshore) | Atlantic |
|
Led vessel traffic and navigational risk analysis for the South Fork Wind Farm Project EIS. — View project page
|
|||||
| 2021 | City of Emmonak | City of Emmonak Port Tariff Implementation | Other | Emmonak, AK | Alaska |
|
Developed a tariff document and companion spreadsheet tool for city staff to calculate port charges under a new tariff structure. — View project page
|
|||||
| 2020 | Northwest Arctic Borough | Cape Blossom Road Benefit-Cost Analysis | Benefit-Cost Analysis | Kotzebue / Cape Blossom, AK | Alaska |
|
Updated benefit-cost analysis for a BUILD grant for the Cape Blossom road and deepwater port project, quantifying freight cost reductions and regional economic benefits. — View project page
|
|||||
| 2020 | Alaska Municipal League | Alaska Ports and Harbors Facilities Survey | Economic Study | Statewide, AK | Alaska |
|
Summary and comparative analysis of a statewide ports and harbors survey, extrapolating planned and needed capital expenditures for all Alaska ports and harbors. — View project page
|
|||||
| 2020 | Alaska DOT&PF | Assessment of Options to Reshape the Alaska Marine Highway System | Economic Study | Statewide, AK | Alaska |
|
Data-driven model estimating ridership, revenue, and service impacts of eleven options to reshape the Alaska Marine Highway System. — View project page
|
|||||
| 2019 | City of Emmonak | City of Emmonak Port Tariff Rate Study | Rate Study | Emmonak, AK | Alaska |
|
Life-cycle cost tariff review and rate recommendations for the City’s new dock and barge landing facility, funded by a federal grant. — View project page
|
|||||
| 2019 | Haines Borough | Lutak Dock Cost Sharing Study | Feasibility Study | Haines, AK | Alaska |
|
Analysis to prepare Haines Borough for negotiations with Alaska Marine Lines over a tidelands lease and roll-on/roll-off facility connected to the Lutak Dock. — View project page
|
|||||
| 2019 | Haines Borough | Lutak Dock Replacement Benefit-Cost Analysis for BUILD Grant | Benefit-Cost Analysis | Haines, AK | Alaska |
|
Benefit-cost analysis of Lutak Dock replacement to support a BUILD Grant application. — View project page
|
|||||
| 2018 | San Juan County | Oil Spill Emergency Response and Towing Vessel Cost Study | Feasibility Study | San Juan County, WA | Washington |
|
Cost study evaluating annual costs for three standby positions for an emergency response towing vessel. — View project page
|
|||||
| 2018 | Nuka Research / World Wildlife Fund-Canada | Phasing Out the Use of Heavy Fuel Oil in the Canadian Arctic: Impacts to Northern Communities | Economic Study | Canadian Arctic | Canada |
|
Economic analysis of the cost implications of phasing out heavy fuel oil use in the Canadian Arctic. — View project page
|
|||||
| 2017 | Port of Corpus Christi Authority | Port of Corpus Christi Tariff Comparison Study | Rate Study | Corpus Christi, TX | Texas |
|
Review of tariffs at Gulf Coast ports to provide guidance on liquid bulk commodity rates at the Port of Corpus Christi. — View project page
|
|||||
| 2017 | City of Homer / R&M Consultants | Homer Deep Water Dock Expansion Feasibility Study | Feasibility Study | Homer, AK | Alaska |
|
Two-phase feasibility study for the Deep Water Dock expansion, covering cargo projections, industrial moorage potential, lease rate evaluation, and funding strategies. — View project page
|
|||||
| 2016 | Haines Borough | Benefit-Cost Analysis of the Lutak Dock Replacement | Benefit-Cost Analysis | Haines, AK | Alaska |
|
Benefit-cost analysis of Lutak Dock replacement for a FASTLANE grant application. — View project page
|
|||||
| 2016 | City of Kodiak | Kodiak Harbor Cash Flow Analysis | Rate Study | Kodiak, AK | Alaska |
|
Updated life-cycle cost analysis and three-scenario cash flow and debt evaluation for Kodiak harbor facilities. — View project page
|
|||||
| 2016 | AAHPA | State Port & Harbor Benefits | Economic Study | Statewide, AK | Alaska |
|
Data collection and white paper documenting the economic and other benefits provided by port and harbor facilities around Alaska, including a statewide survey. — View project page
|
|||||
| 2016 | City of Homer | Homer Harbor Rate Structure Study | Rate Study | Homer, AK | Alaska |
|
Rate structure study evaluating the impact of different vessel length tiers and vessel-type rates on individual vessels and total revenues. — View project page
|
|||||
| 2016 | City of Unalaska | Port of Dutch Harbor Rate Structure Study | Rate Study | Unalaska / Dutch Harbor, AK | Alaska |
|
Comprehensive rate structure study for all Port of Dutch Harbor facilities, creating consistency across use types while reflecting facility differences. — View project page
|
|||||
| 2015 | Cook Inletkeeper / ADV Task Force | Abandoned and Derelict Vessels Survey | Other | Statewide, AK | Alaska |
|
Pro bono survey administration for the Abandoned and Derelict Vessels Task Force to document the costs of dealing with derelict vessels around Alaska. — View project page
|
|||||
| 2015 | Alaska DOT&PF | Southeast Alaska Transportation Plan User Benefits Update | Economic Study | Southeast Alaska, AK | Alaska |
|
Estimated user benefits and system costs for ferry and road linkage scenarios in Southeast Alaska. — View project page
|
|||||
| 2015 | Petersburg Borough / Agnew::Beck | Rate Study for Petersburg Comprehensive Plan Update and Harbor Master Plan | PlanningRate Study | Petersburg, AK | Alaska |
|
Life-cycle cost rate study for Petersburg’s harbor system as part of the Borough’s Comprehensive Plan and Harbor Master Plan update. — View project page
|
|||||
| 2015 | City of Unalaska | Arctic Deep Draft Port Comments | Other | Unalaska / Dutch Harbor, AK | Alaska |
|
Interviews and documentation of historical and planned Arctic vessel activity at Dutch Harbor to support City comments on a Corps report. — View project page
|
|||||
| 2015 | Alaska Marine Highway System / DOT&PF | AMHS Ferry Tariff Policy and Fare Structure Development | Rate Study | Statewide, AK | Alaska |
|
Fare policy and structure analysis for the AMHS, including recommendations for an equitable fare category system and facilitation of a public process. — View project page
|
|||||
| 2015 | Nuka Research and Planning Group, LLC | Cook Inlet Risk Assessment Phase B | Risk Assessment | Cook Inlet, AK | Alaska |
|
Conducted regular and probabilistic benefit cost analyses of a pipeline across Cook Inlet to reduce the risk of spills from vessels crossing the inlet. — View project page
|
|||||
| 2014 | City of Valdez / R&M Consultants | Valdez Harbor Planning Study | Feasibility Study | Valdez, AK | Alaska |
|
Feasibility study for a proposed new harbor in Valdez, incorporating life-cycle cost analysis, economic impact modeling, and a competitive market analysis of target vessel markets. — View project page
|
|||||
| 2014 | National Fish and Wildlife Foundation / Nuka Research and Planning Group, LLC | Aleutian Islands Risk Assessment Phase B | Risk Assessment | Aleutian Islands, AK | Alaska |
|
Conducted benefit cost and cost effectiveness analyses, including a probabilistic benefit cost analysis, of a set of risk reduction options for marine transit in the region. — View project page
|
|||||
| 2014 | Port of Anchorage / Moffatt & Nichol | Port of Anchorage Business Planning | Planning | Anchorage, AK | Alaska |
|
Business plan for the Port of Anchorage documenting cargo origin/destination, vessel traffic forecasts, competitive port assessment, and future business opportunities. — View project page
|
|||||
| 2014 | City of Homer | Rate Study and Economic Benefits Study for the Deep Water Dock | Rate Study | Homer, AK | Alaska |
|
Life-cycle cost rate study for Homer Harbor facilities combined with an economic impact study of an oil rig’s use of the Deep Water Dock. — View project page
|
|||||
| 2014 | Bering Straits Native Corporation | Port Clarence Feasibility Study | Feasibility Study | Port Clarence, AK | Alaska |
|
Feasibility evaluation for improvements at Port Clarence to support Arctic activity, including oil and gas operations and cargo transits through Bering Strait. — View project page
|
|||||
| 2014 | City and Borough of Sitka | Sawmill Cove Feasibility Study | Feasibility Study | Sitka, AK | Alaska |
|
Feasibility study for the Sawmill Cove Industrial Park, evaluating a deepwater dock, large vessel moorage, and haul-out facility, including cargo demand and financial screening. — View project page
|
|||||
| 2014 | The Glosten Associates | Gateway Pacific Terminal Vessel Traffic and Risk Assessment Study | RegulatoryRisk Assessment | Northwest Washington | Washington |
|
Vessel traffic study for the Gateway Pacific Terminal in northwest Washington, including traffic forecasts, queuing analysis, and probabilistic @RISK simulations. — View project page
|
|||||
| 2013 | The Glosten Associates | BP Terminal Vessel Traffic and Risk Assessment Study | RegulatoryRisk Assessment | Northwest Washington | Washington |
|
Vessel traffic study for BP terminal waters in northwest Washington, including traffic data analysis, commodity forecasts, queuing analysis, and @RISK simulation modeling. — View project page
|
|||||
| 2013 | City of Nome | Port of Nome Rate Analysis | Rate Study | Nome, AK | Alaska |
|
Life-cycle cost rate analysis for Port of Nome facilities to evaluate the need for rate adjustments. — View project page
|
|||||
| 2012 | City of Kodiak | Kodiak Cruise Ship Rate Study | Rate Study | Kodiak, AK | Alaska |
|
Cruise ship rate study for the City of Kodiak’s port facilities. — View project page
|
|||||
| 2012 | City of Kodiak | Kodiak Harbor Rate Study | Rate Study | Kodiak, AK | Alaska |
|
Moorage rate study for the Kodiak harbor system, including multiple rate options, an alternative tier structure, and a square-footage-based approach. — View project page
|
|||||
| 2012 | City of Seward | CDQ Homeporting Study | Feasibility Study | Seward, AK | Alaska |
|
Feasibility study for homeporting Community Development Quota fishing vessels in Seward, including a benefits analysis and financing plan. — View project page
|
|||||
| 2012 | City and Borough of Sitka / PND Engineers | Sitka Harbor System Master Plan | PlanningRate Study | Sitka, AK | Alaska |
|
Economic analysis and life-cycle cost rate setting for the Sitka harbor system master plan, including a five-year rate increase schedule and debt evaluation. — View project page
|
|||||
| 2012 | Haines Borough | Port Development Screening Analysis | Feasibility Study | Haines, AK | Alaska |
|
Screening analysis for port development in Haines to support inbound and outbound cargo and fuel needs for Yukon Territory mining and other maritime activity. — View project page
|
|||||
| 2012 | Alaska DOT&PF / DOWL HKM | Southwest Alaska Transportation Plan | Economic Study | Southwest Alaska, AK | Alaska |
|
Development of an update to the Southwest Alaska Transportation Plan, including a marine component. — View project page
|
|||||
| 2011 | Haines Borough | Haines Tariff Study | Rate Study | Haines, AK | Alaska |
|
Multi-phase tariff study reviewing fuel wharfage and cargo rates at ports statewide, followed by life-cycle cost-based rate recommendations for Haines. — View project page
|
|||||
| 2011 | U.S. Army Corps of Engineers / URS | Alaska Regional Ports Phase I | Planning | Statewide, AK | Alaska |
|
Comprehensive statewide study of port and harbor infrastructure needs through 2030, including regional hub identification, policy development, and a statewide ports conference. — View project page
|
|||||
| 2011 | Welder Leshin Law Firm | Port of Corpus Christi Wharfage Rate Study | Rate Study | Corpus Christi, TX | Texas |
|
Independent wharfage rate analysis for crude oil refiners at Port of Corpus Christi public oil docks, including life-cycle cost modeling and a market rate comparison. — View project page
|
|||||
| 2011 | City of Hydaburg | Hydaburg Harbor Moorage Rate Study | Rate Study | Hydaburg, AK | Alaska |
|
Moorage rate study to support the City’s application for Alaska’s Municipal Harbor Facility Grant. — View project page
|
|||||
| 2011 | City of Unalaska | Carl E Moses Boat Harbor Rate Study | Rate Study | Unalaska / Dutch Harbor, AK | Alaska |
|
Developed moorage and other rates for the new Carl E. Moses Boat Harbor in advance of its opening. — View project page
|
|||||
| 2010 | City of Whittier | Whittier Economic Rate Study | Rate Study | Whittier, AK | Alaska |
|
Rate study for Whittier harbor facilities to identify the true cost of marine access and recommend self-supporting rates, including support for a revenue bond and state harbor grant. — View project page
|
|||||
| 2010 | City of Bethel / PND | Port of Bethel Economic Analysis and Long Range Development Plan | Feasibility Study | Bethel, AK | Alaska |
|
Long-range development plan for the Port of Bethel’s dock replacement, incorporating population forecasts and potential mine-related demand. — View project page
|
|||||
| 2010 | City of Kodiak | Kodiak Fuel Tariff Analysis | Rate Study | Kodiak, AK | Alaska |
|
Review of current fuel tariffs at Port of Kodiak facilities with recommendations for updating tariff structures and rates. — View project page
|
|||||
| 2009 | City of Ouzinkie | Ouzinkie Initial Feasibility Analysis and Business Planning | Feasibility Study | Ouzinkie, AK | Alaska |
|
Initial feasibility assessments and business plans for a seafood processing facility, boat haulout and repair services, and a dock in the community of Ouzinkie. — View project page
|
|||||
| 2009 | City of Seward | Seward Marine Industrial Center Uplands Operations Analysis | Feasibility Study | Seward, AK | Alaska |
|
Feasibility study of multiple future operations options for the Seward Marine Industrial Complex’s 250-ton travel lift and the boat storage yard, in light of environmentally-driven infrastructure changes. — View project page
|
|||||
| 2009 | City of Unalaska | Port and Harbor Ten-Year Development Plan Update | Planning | Unalaska / Dutch Harbor, AK | Alaska |
|
Ten-year port and harbor development plan update analyzing facility use, industry trends, infrastructure needs, and rate recommendations for the next decade. — View project page
|
|||||
| 2009 | City of Seward / PND Engineers | Seward Marine Industrial Center Transportation Investment Generating Economic Recovery (TIGER) Grant Assistance | Economic Study | Seward, AK | Alaska |
|
Developed economic stimulus and job creation statistics for a grant application focused on dock and breakwater improvements at the Seward Marine Industrial Center. — View project page
|
|||||
| 2008 | City of King Cove | King Cove Studies | Rate Study | King Cove, AK | Alaska |
|
Series of analyses supporting harbor planning, including moorage fee increases to cover debt service, sustainability modeling, and a successful Municipal Harbor Facility Grant application. — View project page
|
|||||
| 2008 | Port of Anchorage / AEDC | Importance of the Port of Anchorage | Economic Study | Anchorage, AK | Alaska |
|
Evaluation of the importance of the Port of Anchorage by estimating the cost and transportation impacts if the port were not in service. — View project page
|
|||||
| 2008 | City of Homer | Homer Harbor Regional Impacts | Economic Study | Homer, AK | Alaska |
|
Regional economic impact analysis for a proposed harbor expansion using the Harbor Economic Impact Model to evaluate effects on Homer and the Kenai Peninsula Borough. — View project page
|
|||||
| 2008 | City of Sand Point | Sand Point Harbor Rate Study | Rate Study | Sand Point, AK | Alaska |
|
Regional harbor rate study and rate recommendations for Sand Point Harbor to ensure sustainability and consistency with regional peers. — View project page
|
|||||
| 2008 | Alaska DOT&PF | Statewide Harbor Rate Study | Rate Study | Statewide, AK | Alaska |
|
Statewide study of harbor moorage rates for DOT&PF and other entities to develop new rate recommendations for state-owned harbors. — View project page
|
|||||
| 2007 | City of Whittier | Whittier Small Boat Harbor Rate Study | Rate Study | Whittier, AK | Alaska |
|
Rate study for the new Head of Bay harbor based on current harbor users, the vessel waiting list, and proposed infrastructure improvements. — View project page
|
|||||
| 2007 | City of Whittier | Head of Passage Canal Services Preliminary Feasibility Study | Feasibility Study | Whittier, AK | Alaska |
|
Preliminary feasibility study for day-use recreation and boating facilities at the Head of Passage Canal, including revenue estimates and phased development options. — View project page
|
|||||
| 2006 | Port of Anchorage | Port of Anchorage Barge Consolidation and Distribution Facility Concept Feasibility Study | Feasibility Study | Anchorage, AK | Alaska |
|
Evaluated the feasibility of a cargo consolidation and distribution facility as part of the Port of Anchorage expansion. — View project page
|
|||||
| 2006 | Aleutians East Borough / TNH | False Pass Boat Harbor | Economic Study | False Pass, AK | Alaska |
|
Provide fleet description for False Pass and information about the current status and potential of the area’s major fisheries. — View project page
|
|||||
| 2006 | City of Unalaska | Little South America Harbor Revenue Model | Feasibility Study | Unalaska / Dutch Harbor, AK | Alaska |
|
Revenue model for planning the slip size allocation of the proposed Little South America harbor, estimating revenues and capital costs under multiple design configurations. — View project page
|
|||||
| 2006 | Bureau of Indian Affairs / URS Corporation | Cordova Oil Spill Response Facility EIS | Regulatory | Cordova, AK | Alaska |
|
Social and economic affected environment and environmental consequences of an oil spill response facility around Cordova. — View project page
|
|||||
| 2004 | City of Cordova | Travel Lift Feasibility Study | Feasibility Study | Cordova, AK | Alaska |
|
Feasibility study for a travel lift in Cordova, including market analysis, location and size recommendations, and financial impact assessment. — View project page
|
|||||
| 2004 | Alaska DOT&PF | Alaska Harbor Economic Impact Model | Other | Statewide, AK | Alaska |
|
Development of the user interface for the Harbor Economic Impact Model — a Microsoft Excel-based tool used statewide to estimate community, borough, and state-level economic impacts of harbor facilities. — View project page
|
|||||
| 2004 | City of Unalaska | Ten-Year Port and Harbor Development Plan | Planning | Unalaska / Dutch Harbor, AK | Alaska |
|
Ten-year port and harbor development plan identifying, evaluating, and scheduling projects, with fleet analysis, competitive assessment, and financing strategies. — View project page
|
|||||
| 2004 | City of Kodiak | Travel Lift Feasibility Study Update | Feasibility Study | Kodiak, AK | Alaska |
|
Updated feasibility evaluation for a large travel lift in Kodiak, including fleet analysis, labor market assessment, and financial projections. — View project page
|
|||||
| 2004 | City of Seward / TNH | Seward Harbor Expansion Financing Memo | Economic Study | Seward, AK | Alaska |
|
Prepare memo for City Council discussion on potential revenues, funding and financing sources, and preliminary financing strategy for a harbor expansion. — View project page
|
|||||
| 2003 | City of Unalaska | Benefits of Upgrading Position 1 | Economic Study | Unalaska / Dutch Harbor, AK | Alaska |
|
Identified and provided qualitative and quantitative justifications for potential benefits of upgrading UMC Position 1. — View project page
|
|||||
| 2002 | City of Wrangell | Feasibility Study of a Marine Center in Wrangell | Feasibility Study | Wrangell, AK | Alaska |
|
Southeast Alaska vessel market analysis and financial and operational recommendations for a marine center with travel lift in Wrangell. — View project page
|
|||||
| 2002 | City of Valdez | Benefits of Valdez City Dock Improvements | Economic Study | Valdez, AK | Alaska |
|
Evaluated impacts from moving cruise ship berthing to the Valdez City Dock. — View project page
|
|||||
| 2001 | City of Chignik | Economic Feasibility Study of Chignik City Dock and Related Infrastructure | Feasibility Study | Chignik, AK | Alaska |
|
Economic feasibility study for a public dock, travel lift, and marine infrastructure in Chignik to support community economic development. — View project page
|
|||||